The International Accord and a team of Arup engineers conducted pilot safety assessments at 7 garment and textile factories in Karachi and Lahore, Pakistan, between 28 November to 9 December 2022.
The engineers evaluated the existing fire, structural, electrical, and boiler safety measures at these factories to inform the possible establishment of a new workplace safety program there. The factories ranged in size from 180 to 3,500 workers and from 1 single building to up to 9 buildings.
A detailed pilot evaluation report will be drafted in February following an analysis of assessment reports, individual factory remediation discussions, and a pilot evaluation workshop with participating factories and brands.
These safety assessments were a part of the Secretariat’s ongoing feasibility studies to explore Accord programs in new countries. Based on strong interest from stakeholders, the Accord Steering Committee agreed to conduct this pilot in Pakistan to inform the possible establishment of a workplace safety program there. A decision among signatories on the start of a new Accord program is expected before the end of 2022.
The International Accord thanks the teams at all factories for their enthusiastic participation and looks forward to our continued work together.
Related updates
May 1, 2024
Day 2 of the International Accord’s All Signatory Meeting was dedicated to fostering meaningful engagement between the Pakistani industry and signatories to the Pakistan Accord.
April 24, 2024
The Accord commemorates 11 years since the Rana Plaza collapse by remembering those who perished, those who were injured, and those who continue living with the impacts of one of the worst workplace disasters in modern history.
March 28, 2024
The capacity-building program for recently hired engineers under the Pakistan Accord has officially commenced.
May 29, 2024
This briefing includes updates on the number of signatory brands and covered factories, brand-supplier meetings, new Pakistan Accord office and the capacity building program in Pakistan.
May 1, 2024
Day 2 of the International Accord’s All Signatory Meeting was dedicated to fostering meaningful engagement between the Pakistani industry and signatories to the Pakistan Accord.
May 1, 2024
The International Accord held its All Signatory Meeting 2024 on the 25 and 26 of April 2024 at the Rode Hoed in Amsterdam, the Netherlands.